ITI Ltd bags LoIs worth Rs 37.5 cr for Solar Street light Systems in Bihar
Bengaluru/Naini: ITI Limited, the country’s first PSU post-independence and premier telecom manufacturing company has received LoIs worth Rs. 37.5 Crores from Bihar Renewable Energy Development Authority (BREDA) for the installation of Solar Street light Systems.

Details of the LOIs
ITI Limited’s Naini Unit has received LOIs for Design, Supply, Installation, Testing, and Commissioning with a Comprehensive Maintenance Contract (CMC for 5 years) including Remote Monitoring System (RMS) of 2800 Solar Streetlight Systems from DPRO Katihar amounting to Rs. 8.58 Cr under Mukhyamantri Gramin Solar Street Light Yojana.
ITI Limited’s Naini Unit has received another LoI for Design, Supply, Installation, Testing, and Commissioning with a Comprehensive Maintenance Contract (CMC for 5 years) including Remote Monitoring System (RMS) of 9440 Solar Street light Systems from DPRO Katihar amounting to Rs. 28.94 Cr under Mukhyamantri Gramin Solar Street Light Yojana.
These systems are to be installed under the supervision of the Bihar Renewable Energy Development Authority (BREDA) and the major Components of the Solar Street light Systems are Solar PV Modules, Solar Batteries, LED Luminaries, Mounting Structures, Balance of System (BOS).
Commenting on the partnership, Rajesh Rai, Chairman and Managing Director, ITI Limited, said, "ITI Limited is proud to partner with the Government of Bihar’s BREDA to help illuminate streets with sustainable solar energy. This project is a testament to our commitment to sustainability and creating vibrant rural environments. The project adds to aesthetics and provides cutting-edge lighting solutions for a greener tomorrow,” Rai added.
“ITI Limited has acquired rich experience in successfully supplying and installing Solar Street Light Systems in Bihar since last year.”
ITI Limited’s Naini Unit is already manufacturing solar panels that can harness solar power up to 400W.
In terms of yearly production, Naini Unit manufactures solar panels, which can harness 18 Mega Watt (MW) of solar energy which comes to around 55,000 panels per year.
With the enhanced capacity (500 MW), the unit will start manufacturing around 15,00,000 panels per year.
IBNS
Senior Staff Reporter at Northeast Herald, covering news from Tripura and Northeast India.
Related Articles

CRR cut, AI ethics push, and SORR benchmark: Experts hail RBI’s pragmatic policy moves
Mumbai: The Reserve Bank of India (RBI) has kept the repo rate unchanged at 6.5% while the cash reserve ratio (CRR) has been slashed by 50 basis points to 4 percent, media reports said.

JP Morgan gives 'overweight' rating to Adani Group bonds
Mumbai: US investment bank JP Morgan has assigned an 'overweight' rating to four bonds issued by the Adani Group, citing the group's capacity to scale and grow through internal cash flows, which reduces the likelihood of credit stress.

LG Electronics files DRPH with SEBI; IPO size expected to be over RS 15,000 cr
Mumbai: South Korean electronics giant LG Electronics has filed a draft red herring prospectus (DRHP) with the Securities and Exchange Board of India (SEBI) on Friday for the proposed public listing of its Indian business, according to a notification on the Bombay Stock Exchange (BSE).

De-dollarisation not on India's agenda; derisking domestic trade is: RBI Governor Shaktikanta Das
Mumbai: India has not initiated any steps towards de-dollarisation and is solely focused on mitigating risks to domestic trade from geopolitical uncertainties, Reserve Bank of India (RBI) Governor Shaktikanta Das clarified on Friday, media reports said.
Latest News

Trump, Netanyahu unveil 20-point Gaza peace plan, warn Hamas to accept deal or face 'full destruction'

Drugs valued at 60 crore seized in Tripura

Tamil Nadu stampede: TVK leader arrested, actor-politician Vijay named in FIR

Despite rising power demand in Durga Puja, Tripura continues electricity supply to B'desh: Minister
